top of page
Beaumont District Projects

I-10/I-69 Eastex Interchange: Geotechnical engineering design support for the estimated $320 million project to widen the I-10/US 69 roadway from four to six mainlanes and reconstruct the "Eastex" interchange from the Hollywood Overpass east to 7th Street, including construction of frontage roads, sound walls, retaining walls, and 15 bridges

 

US 190: PS&E geotechnical engineering support for the $18 million project to replace the US 190 Neches River and Neches River relief bridges in Tyler County

I-10: CEI construction scheduling support for the $52 million project to widen four miles of I-10 from east of FM 3247 to the Sabine River Bridge in Orange County

20201205_133053.jpg

Foresight's engineers monitor drilling activities and perform geotechnical analysis for the US 190 Project

bottom of page