Dallas Area Projects
TxDOT Dallas District
​
I-35 East Phase 2 GEC and OVTI: Scheduling and geotechnical engineering support for the estimated $675M "Texas Clear Lanes" design-build (D-B) project to add two general purpose mainlanes in each direction (widening from six to eight lanes), fully reconstruct the existing mainlaines and two grandfathered reversible tolled managed lanes, and construct frontage road and intersection improvements along the southern segment of I-35 East from I-635 to the Denton County line
​
I-35 East at FM 1171: Construction scheduling support for the estimated $83.49 million project to reconstruct the frontage roads and grade-separated I-35E interchange at FM 1171/Main Street in Denton County
​
I-30 "Canyon": Construction scheduling support for the estimated $890 million project to reconstruct a 2.3-mile segment of I-30 in downtown Dallas between I-35E and I-45, delivering expanded capacity through additional lanes, full bridge replacements, and corridor enhancements that improve safety, connectivity, and long-term mobility
​
Loop 288: Geotechnical engineering design support for the 9-mile, estimated $922M project to construct the State Loop 288 extension along the western side of the City of Denton between I-35 and I-35W, including reconstruction and widening of the mainlanes from four to six lanes, construction of two frontage roads in each direction, an overpass at US 380 with four direct connectors, hydraulic and hydrologic analysis and bridge plans for ultimate grade separations, and tie-ins at I-35 and I-35W
​
FM 2181 (Teasley Lane): Construction scheduling services for the $30 million project to widen FM 2181 from a two-lane rural roadway to a six-lane urban roadway from Lillian Miller Parkway to west of FM 2499 in Denton
​
US 377: Construction scheduling services for the $18.5 million project to widen US 377 from a two-lane undivided roadway to a six-lane divided roadway from I-35 E to FM 1830
​
FM 3549: Construction scheduling services for the $9 million project to widen FM 3549 from a two-lane undivided roadway to a four-lane divided roadway with sidewalk alterations and improvements from I-30 to just north of SH 66 in Rockwall County
​​
North Texas Tollway Authority (NTTA)
​
Maintenance Management: Maintenance Management Consultant (MMC) geotechnical engineering support for the NTTA system, including planning, budgeting, and design engineering for routine maintenance projects, development of maintenance management systems, review of GEC annual inspections, and specialized inspections of major assets
​​
City of McKinney
​
East Virginia Parkway: Geotechnical investigation for the East Virginia Parkway Rehabilitation project, including pavement assessment, subsurface exploration and sampling, laboratory testing, and preparation of a pavement design report with recommendations in accordance with City pavement and subgrade design standards
​
​
​