
Other Projects
North Texas Tollway Authority (NTTA):
-
DNT over US 380: Geotechnical engineering and construction scheduling services for the $53 million project to extend the Dallas North Tollway over US 380 by adding a lane to the direct connector ramps
-
DNT Phase 4B Frontage Road: Geotechnical engineering and construction scheduling services for construction of the Phase 4B frontage road from FM 428 to CR 60 (Grayson County Line).
-
NTTA MSE Wall Stabilization and Maintenance Program: Geotechnical engineering services for the $57 million program to rehabilitate retaining walls across the NTTA roadway system.
City of Denton:
-
Construction claims support for the $36 million Mayhill Road Project to transform the existing undivided two-lane road to a divided four-lane road, update drainage systems, and relocate waterlines
​
​
City of Round Rock:
-
Geotechnical engineering support services for the extension of Old Settlers Boulevard from CR 122 to CR 110 by adding a 4-lane divided roadway with a bridge segment over McNut Creek
​
​Central Texas Regional Mobility Authority (CTRMA):
-
Geotechnical engineering support for the general engineering consultant team overseeing PS&E development for an 8-mile segment of MoPac South from Cesar Chavez Street to Slaughter Lane in Austin
-
Geotechnical engineering support for the general engineering consultant team overseeing construction of US 183 South from US 290 to SH 71 in Austin
-
183 North Mobility Project – Geotechnical and scheduling support for construction oversight of the approximately $612 million project to add two express lanes and one general purpose lane in each direction to a nine-mile section of US 183 from SH 45 to MoPac in northwest Austin
​
Dallas Fort Worth Airport Project:
-
Geotechnical engineering and forensic engineering support services for ongoing IDIQ contract associated with existing infrastructure at DFW Airport and ancillary facilities

Old Settlers Boulevard Extension Project